Utility
Home Renovation Budget
Estimate renovation costs by room type, area, and quality level. Get material and labor breakdowns with timeline estimates.
Select room type, area, and quality, then click Calculate
How is this calculated?
Cost per sq ft by room and quality:
Kitchen: Budget $80 | Mid $180 | High $350
Bathroom: Budget $100 | Mid $250 | High $450
Bedroom: Budget $40 | Mid $80 | High $150
Living: Budget $50 | Mid $100 | High $200
Material vs Labor split:
Materials: 55-60% of total
Labor: 40-45% of total
Timeline (weeks):
Kitchen: 6-8 (budget) to 10-12 (high)
Bathroom: 3-4 (budget) to 6-8 (high)
Bedroom: 2-3 (budget) to 4-5 (high)
Living: 3-4 (budget) to 5-7 (high)
Total = Area × Cost per sq ft
+ 10% contingency recommended FAQ
Frequently asked questions about renovation costs
How much does a kitchen renovation cost?
A kitchen renovation averages $25,000-$75,000 depending on quality. Budget level: $80-120/sq ft, mid-range: $150-250/sq ft, high-end: $300-500+/sq ft. Cabinets and countertops typically consume 40-50% of the budget.
How much does a bathroom remodel cost?
A bathroom remodel costs $10,000-$30,000 on average. Budget: $100-150/sq ft, mid-range: $200-350/sq ft, high-end: $400-600/sq ft. Plumbing changes significantly increase costs.
What percentage of renovation cost is labor?
Labor typically accounts for 35-45% of total renovation costs. Complex trades (plumbing, electrical) charge more per hour ($75-150/hr) than general contractors ($50-85/hr). Labor rates vary significantly by region.
How long does a renovation take?
A bathroom takes 3-6 weeks. A kitchen takes 6-12 weeks. A full home renovation can take 3-6 months. Add 20-30% buffer time for unexpected issues, permit delays, and material backlogs.
Should I get permits for renovation?
Yes, permits are required for structural changes, electrical/plumbing work, HVAC, and additions. Skipping permits can result in fines, forced removal of work, and problems selling your home. Permit costs are typically $500-2,000.
How can I save on renovation costs?
Keep plumbing in existing locations, refinish instead of replacing cabinets, do demo yourself, shop clearance for materials, avoid changing the floor plan, and get 3+ contractor bids. Timing renovations in winter can save 10-15%.